(1) The amount of core recovered compared to the amount cut.
(2) The height of fluid in the drill pipe on a drill-stem test which did not produce enough fluid to rise to tlme surface.
(3) The total volume of hydrocarbons that has been or is anticipated to be produced from a well or field.